Plumber modifying copper pipes inside an open wall during a residential bathroom renovation.

A successful renovation involves more than choosing a new sink, shower or vanity. As soon as a fixture is relocated, a bathroom is added or walls are opened, the water supply, drainage, venting, valves and future access must be planned before the finishes are closed back up.

SOS Plombiers receives and qualifies requests for plumbing renovations in Greater Montreal, then attempts to direct them to a partner contractor based on the area, the nature of the project and availability. The assigned company confirms feasibility, defines the work, provides its proposal and invoices the authorized work.

This page covers planned plumbing system modifications: relocating or adding a fixture, creating new connections, preparing a bathroom, adapting the piping to a new layout or taking advantage of open walls to correct an aging section. For a one-time repair that does not involve modifying the plumbing system, see our toilet, faucet and plumbing fixture repair service instead.

Plans and measurementsCompare the current layout with the proposed design before work begins.
Coordinated connectionsWater supply, drainage, venting, valves and access.
Scope confirmed on siteThe partner confirms the price, schedule and work.

Kitchen, bathroom or basement project

Send the plans, photos and fixture list

To properly direct the request, indicate what is currently in place and what needs to change. The most useful information includes:

  • the address and type of building;
  • the room being renovated and the new layout;
  • the fixtures being relocated, added or replaced;
  • photos, a dimensioned sketch or any available plans;
  • the state of the worksite: walls closed, demolition planned or walls open;
  • the renovator’s or property manager’s contact information, if applicable.

Call (514) 418-4456

Get a quote (Plumber Montreal)

The plumbing behind the new layout

Which projects involve a plumbing renovation?

The need is not defined by the name of the room, but by the modifications required to supply, drain and vent the fixtures in their new locations.

Bathroom

Creating or renovating a bathroom, relocating a toilet, bathtub, shower or vanity, adding shutoff valves and preparing the connections before the finishes are installed.

  • shower and bathtub;
  • toilet and bidet;
  • single or double vanity;
  • powder room;

Kitchen and laundry room

Adapting the water supply and drain for a new sink, island, dishwasher, refrigerator with a water connection or washing machine, based on the plans, selected appliances and available access.

  • relocated or added sink;
  • dishwasher;
  • refrigerator and ice maker;
  • washing machine and laundry sink;

Basement and new living space

Plumbing preparation for a new bathroom, kitchenette or laundry room. The location of the main drain, elevation, venting and protection against sewer backups may influence the solution.

  • new bathroom;
  • kitchenette;
  • laundry room;
  • conversion of a dwelling unit;

More extensive renovation

Modifying several branches, selectively replacing accessible piping while the walls are open or coordinating plumbing work in a plex, rental building or commercial space.

  • redistribution of fixtures;
  • accessible aging sections;
  • valves and maintenance access;
  • coordination between trades;

Avoid choosing the wrong service

Simple replacement or plumbing modification?

The distinction matters when choosing the right professional, preparing the worksite and preventing a small request from becoming a poorly defined project.

Replacement in the same location

A faucet, toilet or sink replaced in the same location, with accessible and compatible connections, generally falls under the plumbing fixture service.

  • no drain relocation;
  • no new water supply line;
  • no major opening required;
  • compatible dimensions and connections.

Plumbing system modification

This page is the right destination when the layout changes: a fixture is relocated or added, pipes are extended, a new drain is installed, venting is modified, walls are open or coordination with a general contractor is required.

  • new location;
  • new room or fixture;
  • piping to be modified;
  • work divided into several stages.

Before demolition and before closing the walls

Six decisions that prevent costly rework

An inspiration photo is not a substitute for a connection plan. The earlier the choices are made clear, the easier it is to coordinate the plumbing with the cabinetry, structure, electrical work, ventilation and finishes.

  1. Determine the exact location of the fixtures. Centre lines, heights and clearances must match the plans and technical specifications.
  2. Select the fixtures early enough. A bathtub, shower, wall-mounted faucet or specialty toilet may require specific connections.
  3. Locate the existing pipes. The actual location of the water supply, drain and venting may limit the proposed relocation.
  4. Define who opens and closes the walls. The proposal must specify demolition, drilling, protection of the premises and restoration.
  5. Plan for water shutoffs and access. In a plex, condominium or commercial property, occupants and the property manager may need to be notified.
  6. Have the work checked before closing the walls. Concealed work must be completed, coordinated and checked before panels and finishes are installed.

A better-prepared request

What a plumber needs to understand before providing a price

A reliable estimate requires more than the square footage and a preferred date. The partner must compare the existing configuration with the proposed layout, then confirm what is visible, accessible and feasible.

  • current and proposed plans, even in the form of a dimensioned sketch;
  • photos of the fixtures, basement and accessible pipes;
  • technical specifications for fixtures already selected;
  • known materials and the approximate age of the plumbing;
  • extent of the demolition and planned access;
  • person responsible for the worksite and the planned order of the trades;
  • condominium, tenant or working-hour restrictions;
  • requested work, options and items explicitly excluded.

From the plans to the final connections

In what order is the plumbing work completed during a renovation?

The number of visits depends on the project. A renovation involving concealed pipes is often completed in separate stages so the walls are not closed before the plumbing system is ready.

  1. 1

    Validation

    The plans, fixtures, access, existing materials and responsibilities are reviewed. The partner specifies the assumptions and the items that must be confirmed on site.

  2. 2

    Preparation

    Water shutoffs, demolition and required openings are coordinated with the owner, renovator, property manager and other trades.

  3. 3

    Rough-in plumbing

    The planned water supply lines, drains, vents, valves and supports are installed or modified while the cavities are accessible.

  4. 4

    Verification

    The completed scope and concealed connections are checked in accordance with applicable requirements before the walls and floors are closed.

  5. 5

    Finishing

    After the surfaces and cabinets are installed, the fixtures are connected, secured and tested within the scope of the authorized work.

Older homes and open walls

A renovation may reveal conditions that were initially hidden

The plans show the desired result, but they do not always show what is behind the finishes. Aging piping, previous connections, restricted access or a configuration that differs from expectations may change the solution.

When the walls are already open, it may be worthwhile to have the accessible sections assessed before closing them. This does not mean everything must be replaced: the decision must be based on the observed condition, compatibility, the scope of the project and the risk of having to reopen the finishes.

Conditions to document

  • corrosion, signs of leakage or old repairs;
  • materials and diameters of visible pipes;
  • slope, support and routing of drain lines;
  • location and accessibility of valves;
  • venting and fixture connections;
  • structural elements that restrict routing;
  • shared branch serving other dwelling units.

Important: a remote estimate cannot confirm the condition of concealed pipes. The partner must report any discoveries and obtain authorization before completing additional work.

Permits, licensing and responsibility

Check the rules before starting

In Montréal, the City states that it no longer issues municipal permits for the plumbing work itself, but provincial rules continue to apply. A municipal permit may nevertheless be required if the renovation modifies a wall, the structure, the floor area, the division or the use of a room. Requirements may also vary by borough and municipality.

Consult the official Ville de Montréal process for interior renovations. For professional obligations, the CMMTQ explains who should carry out plumbing work, and the RBQ describes the required licences.

A proposal based on the actual scope

What affects the cost of a plumbing renovation?

There is no single price per room. Two bathrooms of the same size may require very different work depending on the distance to the connections, access and selected fixtures.

Configuration and work

  • number of fixtures relocated or added;
  • distance to existing pipes;
  • modification of drainage and venting;
  • walls, floors or ceilings that must be opened;
  • existing piping that must be corrected or adapted;
  • number of visits and worksite coordination.

Building and organization

  • house, condominium, plex or commercial space;
  • access to valves, stacks and mechanical rooms;
  • water shutoff affecting other occupants;
  • specialty fixtures and required parts;
  • parking, protection of the premises and debris removal;
  • required permits, plans or professionals.
Request a written scope. The proposal should distinguish between the rough-in plumbing, final connections, supplied fixtures and materials, openings, restoration, excluded work and the process for authorizing unforeseen conditions.

Residential, multi-unit and commercial

The same modification is not planned the same way in every building

House or condominium

Kitchen, bathroom, laundry room or basement, with particular attention to the plans, selected fixtures, open walls and responsibility for the finishes.

Plex and rental building

Shared stacks, water shutoffs, access to dwelling units, notices to occupants and coordination with the owner or property manager affect the schedule.

Commercial space

The intended use, operating hours, business continuity, access and property manager requirements must be considered. Also see the commercial plumbing service.

The role of SOS Plombiers and the partner

How is the request handled?

SOS Plombiers helps direct the request; the partner company remains responsible for the technical assessment, its proposal, the authorized work and invoicing.

01

You describe the project

Address, plans, photos, fixtures, stage of the project, people to coordinate with and preferred timeframe.

02

The request is qualified

We distinguish a planned renovation from a repair, drain cleaning or work on a main line.

03

A partner validates the request

The company communicates its availability and confirms the information, required visit and its conditions.

04

The scope is authorized

The partner specifies the price and work. Any discovery or modification must be explained before the scope is expanded.

To understand how the network operates and how responsibilities are divided, see the About SOS Plombiers page.

Network coverage

Plumbing renovations in Greater Montreal

The ability to direct a request depends on the area, scope, stage of the project and available partner contractors.

Laval and the North Shore

Laval, Terrebonne, Repentigny, Saint-Eustache and areas of the North Shore.

Longueuil and the South Shore

Longueuil, Brossard, Boucherville, Châteauguay and areas of the South Shore.

Is your municipality not listed? Send the address and a summary of the project. You can also consult the network’s directory of plumbing services.

Frequently asked questions

Plumbing renovations and modifications

When should a plumber be consulted during a renovation?

Ideally, before finalizing the plans and ordering the fixtures. The plumber can check whether the proposed locations are compatible with the water supply, drain, venting, structure and access. Waiting until after demolition or furniture delivery may limit the options.

Can a toilet, sink or shower be relocated anywhere?

No. Feasibility depends on the routing and slope of the drain, venting, structure, floor thickness and access to existing pipes. A site visit and sometimes plans are required to confirm the solution.

Is a permit required to modify plumbing during a renovation?

Requirements depend on the municipality and the overall project. In Montréal, plumbing is governed by provincial rules, while a municipal permit may be required if the work modifies a wall, the structure, the floor area, the division or the use of a room. Check before starting.

Who is responsible for opening and closing the walls?

This must be specified in the scope. The plumber may require specific access without necessarily completing all demolition or restoration. The owner, general contractor and partner must agree on protection of the premises, openings and finishes.

Should I select the fixtures before the rough-in plumbing?

Yes, whenever possible. Technical specifications often determine the drain position, heights, valve type, installation depth and clearances. A late model change may require the connections to be modified.

Can old pipes be replaced while the walls are open?

Accessible sections can be assessed and, if their condition or the scope justifies it, included in a proposal. It should not be assumed that the entire system must be replaced without an inspection. The partner must explain the observations, options and limitations.

How many visits should be expected?

A simple replacement can sometimes be completed in one visit, but a renovation involving concealed pipes often includes a rough-in stage followed by a final connection stage. Verifications, inspections and the schedules of other trades may add visits.

How much does a plumbing renovation cost?

The price depends on the number of fixtures, their relocation, access, existing materials, openings, venting, plans, permits and coordination. The partner company must confirm its charges and provide a scope specifying inclusions, exclusions and how unforeseen conditions will be handled.

A plan to validate before opening or closing the walls?

Tell us about your plumbing renovation project

Send the address, plans or sketches, photos, fixture list and the current stage of the project. SOS Plombiers will attempt to direct the request to an appropriate partner contractor based on the area, scope and availability.

The partner confirms feasibility, availability, price, schedule and the work to be completed.

Experiences of customers served through the network

Reviews associated with SOS Plombiers

The reviews below are aggregated by Trustindex from profiles associated with SOS Plombiers. They may relate to different services and partner contractors within the network.

SOS Plumbers Logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.